ARTPIE
← Read another story

Public Event

Completed

Pixel Network Chae Hyun-jji Fan Meeting

On December 6, 2025, Pixel Network’s Chae Hyun-jji fan meeting, “Seeing Chae Hyun-jji in Spring Even in Winter!”, was held. With the goal of creating an interactive fan meeting where fans and the artist could communicate closely, ARTPIE integrated the entire event, from venue preparation and on-site operations to stage technology, video, and design. In addition to talks and live performances, the project was designed with a variety of programs—including real-time Q&A, rewriting the profile, dance reactions, bingo, a balance game, a lucky draw, and a group photo—so fans could participate directly and create memories.

Client · Partner
Pixel Network
Date
2025.12.06
Location
Gabin Art Hall
Scale
200 people
픽셀네트워크 채현찌 팬미팅 / 픽셀네트워크 채현찌 팬미팅
On-site photograph verified from ARTPIE’s original files

PROJECT SCOPE

What ARTPIE handled

  1. 01- Venue rental and on-site operations planning
  2. 02- Deployment of 4 operations staff and management of setup, teardown, and audience entry
  3. 03- Seating organization and operation of the photo zone and information desk
  4. 04- Sound, lighting, and LED system setup and rehearsal management
  5. 05- Planning and execution of the opening video, talk, performance, and interactive programs
  6. 06- Preparation for operating an open chat and QR code for real-time Q&A
  7. 07- Operation of interactive content such as bingo, roulette, balance games, and lucky draws
  8. 08- Formation of a video team and management of filming, streaming, and editing
  9. 09- Event design work including posters, banners, and tickets
  10. 10- Overall on-site schedule management from setup and the main event through equipment teardown
  11. 11Operations consisted of setup and rehearsal beginning at 4 p.m., on-site preparation, house opening, the main event from 6 p.m. to 8 p.m., and equipment teardown until 10 p.m.

WHAT STAYED WITH US

The 2-hour fan meeting was organized into 12 interactive programs, with detailed operating standards established for each program to systematize the entire process from setup through teardown.