ARTPIE
← Read another story

Public Event

Completed

State University of New York Korea year-end party

ARTPIE oversaw the construction and on-site operation of the stage, sound, lighting, and LED systems for State University of New York Korea’s year-end event. On a 7.5m×6.25m stage, we erected 15-sided trusses on three sides and the ceiling, mounted a 200-inch LED screen and beam and wash moving lights, and set up main, sub, and monitor speakers along with band instruments including drums, amps, and keyboards to complete a year-end stage suitable for performances. From installation the previous day through teardown on the day of the event, sound, lighting, and LED supervisors and staff remained on site and operated the systems in real time according to the program flow.

Client · Partner
SUNY Korea
Date
2025.11.21
Location
SUNY Korea
Scale
300
사진이 없어서 대표 사진 설명은 예상 장면으로 썼으니, 실제 올리실 사진에 맞게 한 줄만 손보시면 됩니다. 공연 내용(학생 밴드 등)과 장소는 견적에 없어 넣지 않았습니다. / 사진이 없어서 대표 사진 설명은 예상 장면으로 썼으니, 실제 올리실 사진에 맞게 한 줄만 손보시면 됩니다. 공연 내용(학생 밴드 등)과 장소는 견적에 없어 넣지 않았습니다.
On-site photograph verified from ARTPIE’s original files

PROJECT SCOPE

What ARTPIE handled

  1. 01- Stage — Installation of a 7.5m×6.25m×0.9m stage (2 stairs, black Decotile)
  2. 02- Truss — Installation of a three-sided plus ceiling structure using 15-sided truss; mounting of lighting and LED
  3. 03- Sound — 4 main speakers, 2 subs, 2 monitors; console and microphone setup; real-time operation by a sound supervisor and assistant
  4. 04-Lighting — Beam moving lights 4 · wash moving lights 8 · T-stand white lighting setup, with real-time direction by the lighting director
  5. 05-LED — Installation of a 200-inch LED screen and operation by a dedicated operator
  6. 06-Instruments·Backline — Band-performance instrument setup including drums, bass amp, electric amp and keyboard
  7. 07-Power — Installation of an event distribution board and power distribution by system
  8. 08-On-site operations — 8 staff for setup the day before and operations on the day of the event; technical staff stationed on-site from setup through teardown

WHAT STAYED WITH US

We completed a performance-ready stage equipped with truss, LED, and band backline through installation one day in advance, and professional supervisors operated the sound, lighting, and video in real time, enhancing the stage quality and on-site engagement of the year-end event.